Ordered 120 study desks against a school tender. Container was loaded on day 24 — one day inside the 25-day lead time we were quoted, and no units arrived damaged.
OEM / ODM · Own factories in Jiangxi
Children's desks and chairs from three factories we own — 60,000 m² of floor, 300 technicians, one 25-day lead time.
01 — Anatomy
Four adjustment points carry every model we make. The same crank, the same shell, the same frame.
Hand-crank lift
Crank on the left column — no tools, no pinch points.
Contoured seat shell
Depth and slope set for growing thighs, not adult ones.
Curved footrest
Ties both columns together and closes the sitting posture.
02 — Assembly
The lift column is the spine — it never moves. Everything else lands on it, in order.
03 — Compliance
Tested to EN 1729. ISO management system, China Green Product and CQC eco-label certificates on file.
04 — Enquiry
Some models need a 50–200 set run. We confirm the exact minimum by email.
05 — Catalogue · 63 published models
06 — Materials
Covers, shells, columns and feet — the four parts that take the abuse.
07 — Where it's made
Welding, moulding, powder coating, warehousing — the whole line sits in Jiangxi, and all three plants are ours.
Owned plants: Jiangxi Qisheng · Jiangxi Diwei · Leju Intelligent Equipment. 60,000 m² of floor, 300 technicians.
08 — The range
School and home ranges off the same three lines — every shell, crank and frame is ours, so a colour change is a phone call, not a retool.
09 — By the numbers
Floor space across the three plants we own
Technicians on the line and in the tool room
Production lead time, once the order is confirmed
The team has been building school furniture
Opening order on most models — some need 50 or more
10 — Reviews
Placeholder copy · real reviews to be imported from Alibaba International
Ordered 120 study desks against a school tender. Container was loaded on day 24 — one day inside the 25-day lead time we were quoted, and no units arrived damaged.
We asked for our own carton print and a modified height range. Drawings came back in three days and samples in two weeks. That turnaround is not normal for this category.
The ISO certificates are in the factory’s own name — Qisheng — not a trading company’s. That was the single reason we moved the programme away from our previous supplier.
Fourth container with them. There is a QC report with photos before every loading, and they flag problems instead of quietly shipping them.
We started with 20 sets across three models. Nobody pushed us toward a full container on the first order, which is why there was a second one.
Frame samples went through the drop test our own lab runs. The paperwork matched the shipment line by line, which is rarer than it should be.
Fourth container with them. There is a QC report with photos before every loading, and they flag problems instead of quietly shipping them.
We started with 20 sets across three models. Nobody pushed us toward a full container on the first order, which is why there was a second one.
Frame samples went through the drop test our own lab runs. The paperwork matched the shipment line by line, which is rarer than it should be.
Ordered 120 study desks against a school tender. Container was loaded on day 24 — one day inside the 25-day lead time we were quoted, and no units arrived damaged.
We asked for our own carton print and a modified height range. Drawings came back in three days and samples in two weeks. That turnaround is not normal for this category.
The ISO certificates are in the factory’s own name — Qisheng — not a trading company’s. That was the single reason we moved the programme away from our previous supplier.
11 — Certificates
Three ISO systems, China Green Product, China Eco-Label, a provincial green-eco certification and the Jiangxi Top Brand award — all issued to Jiangxi Qisheng School Equipment, the plant that actually makes your order. Not a trading company that bought someone else's certificates.
Seven documents · Issued 2023–2024 · All in the factory's own name · Hover to hold a string
12 — How an order runs
13 — Questions
From 20 sets on most models. A few need 50 to 200, depending on the frame and the finish — worth confirming by email before you quote your own customer.
Yes. The sample itself is charged and the courier is on the buyer's account. It is the fastest way to settle colour, height and packaging before a bulk run.
25 days from confirmation. Welding, moulding and powder coating all happen in our own plants, so there is no outside queue in the middle.
ISO 9001, ISO 14001 and ISO 45001, all three currently valid, plus the China Green Product certificate. On CE we can send an EN 1729 test report — that is a compliance statement for the samples tested, not a certificate for the factory.
Both. Tell us which one you need in the enquiry and we will come back with what it changes — tooling, colour, packaging or the lead time.
T/T — 30% with the order, 70% before shipment.
14 — OEM / ODM
Tell us which one moves and we'll come back with what it costs, and what it does to the schedule.